What the filing says
A public-record reading of the proposed work.
New 3 piece bathroom in cellar. new mopsink in cellar. new water drain in cellar. remove 2 water drains in cellar. repair 2 water drains in cellar. no change in use, egress, occupancy and bulk.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01251249-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01251249-S1
- BBL
- 4012030036
- Postal code
- 11377 · 290 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2