What the filing says
A public-record reading of the proposed work.
Interior renovation of existing 2-story building with general construction work as per plans filed herewith. related plumbing work will be filed subsequently. no change in use, egress or c of o.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story one-family home built in 1930, on a 5,820 sq ft lot.
- Built
- 1930
- Floors
- 2
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R1-2A
- Lot area
- 5,820 sq ft
- Building area
- 2,237 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 9, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 4 notices on file; the most recent was issued Apr 15, 2023.
- Structurally compromised
Issued Apr 15, 2023 — FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISE
- Construction
Issued Feb 8, 2023 — AT TIME OF INSPECTION OBSERVED FLOOR AT 1ST LEVEL UNSTABLE/SAGGING MISSING SUPPORT AT MULTIPLE LOCATIONS, ROOF JOISTS CHARRED, CELLAR FLOODED, SKYLIGHTS OUT.
- Construction
Issued Feb 8, 2023 — AT TIME OF INSPECTION OBSERVED DEMOLITION WORK AT 1ST,2ND AND ATTIC LEVEL WHERE PARTITION WALLS HAS BEEN REMOVED AT MULTIPLE LOCATIONS. NO PERMIT FOUND ON DOB RECORD. STOP ALL WORK EXCEPT HOUSEKEEPING AND SAFETY
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 9, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01398447-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 77,830 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01398447-P1
- BBL
- 4052810083
- Postal code
- 11358 · 168 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 1
- Proposed dwelling units
- 1