NYC DOB record · B00331456-I1

35 Seacoast Terrace

35 Seacoast Terrace, Brooklyn, NY 11235

Alteration filing in Brighton Beach, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00331456-I1

35 Seacoast Terrace

Brooklyn, NY 11235

Alteration filing · status dated Dec 27, 2020

Current record
Approved
Proposed scale
Not stated
Dwelling units
383
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00331456-I1 as a alteration filing at 35 Seacoast Terrace, Brooklyn, NY 11235. Its latest published status category is Approved, dated Dec 27, 2020. The filing records 383 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 27, 2020
Proposed scale
383 proposed dwelling units
Complete building dossierView all 3 filings associated with BIN 3245725Applicant of recordSee the 23 filings that name Winton Group Architecture
FiledApr 30, 2020
Current recordApproved
Proposed scale383 units
Recorded cost$8,424

What the filing says

A public-record reading of the proposed work.

Install (1) one sprinkler head off domestic water line

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 20-story elevator apartment building built in 1962, with 383 homes, on a 67,805 sq ft lot.

Built
1962
Floors
20
Residential units
383
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
67,805 sq ft
Building area
404,149 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 96 notices on file; the most recent was issued Dec 31, 2025.

  • Construction

    Issued Dec 31, 2025 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #B01129714-I1 ON 10/22/25. INTENT TO REVOKE APPROVAL AND PERMIT. STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE.

  • Construction

    Issued Dec 9, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 1 DEFECTED BALCONY SLABS. EXPOSURE 2 DAMAGED JOINTS. EXPOSURE 3 MISSING BRICKS, CRACK AND DEFECTED BALCONY. EXPOSURE 4 DAMAGED JOINTS. REMEDY: REPAIR AND/OR REPLACE

  • Plumbing

    Issued Jun 20, 2025 — BASE ON COMMISSIONER'S SUSPENSION NOTIFICATION INTENDS TO REVOKE ALL PLUMBING APPROVALS AND PERMIT ISSUED UNDER JOB #300321505 DUE TO SUSPENSION OF LICENSE MASTER PLUMBER #001343, STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT IMMEDIATELY.

  • 5 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00331456-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00331456-I1
BBL
3087210360
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
383
Proposed dwelling units
383