What the filing says
A public-record reading of the proposed work.
Application filed for sprinkler system pressure tank replacement on the roof to resolve ecb violation #39185014h as per plans filed herewith. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 21-story office building built in 1927, on a 6,806 sq ft lot.
- Built
- 1927
- Floors
- 21
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- M1-9A/R12
- Lot area
- 6,806 sq ft
- Building area
- 143,845 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 87 notices on file; the most recent was issued Aug 12, 2017.
- Construction
Issued Aug 12, 2017 — .EXCAVATION WORK AT ADJACENT SITE AT 211 WEST 29TH STREET, WATER CONDI TION IN CELLAR TANK ROOM WITH APPROXIMATELY 2 " OF WATER ON THE FLOOR ALSO HOLE MADE IN EXPOSURE 2 RUBBLE STONE FOUNDATION WALL APPROXIMATEL Y 1' X 1'
- Facade safety program
Issued Mar 6, 2017
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01448239-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01448239-I1
- BIN
- 1014290
- BBL
- 1007790039
- Postal code
- 10001 · 660 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0