What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1923, with 40 homes, on a 10,230 sq ft lot.
- Built
- 1923
- Last altered
- 1986
- Floors
- 6
- Residential units
- 40
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R8
- Lot area
- 10,230 sq ft
- Building area
- 41,670 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 10 notices on file; the most recent was issued Apr 2, 2026.
- Construction
Issued Apr 2, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE AT TIME OF INSPECTION,DEEP CRACKING TERRACOTTA WINDOW LINTEL MASONRY DECOR ON TOP OF WINDOW AND HORIZONTAL CRACKS.STEP CRACK MULTI-LOCATION AT EXPOSURE 1 WEST ELEVATION AND BULGING,DISLODGING WINDOW LINTEL BRICKS ON TOP OF FIRE ESCAPE MULTI-LOCATION.REMEDY:OWNER TO REPAIR AND/OR REPLACE
- Construction
Issued Apr 2, 2026 — EWO DUE TO NEW FOUND HAZARDOUS CONDITIONS.DEEP CRACKING TERRA-COTTA WINDOW LINTEL MASONRY DECOR AT TOP OF WINDOW.HORIZONTAL CRACKS,STEP CRACKS MULT LOCATIONS #EXP1 W ELEV & BULGING,DISLODGING WINDOW LINTEL BRICKS ATOP FIRE ESCAPE.REMEDY:OWNER IMMED PROVIDE ADEQUATE SAFETY MEAS #EXP1&3 WEST & EAST ELEVATION TO PROTECT PUBLIC
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00785164-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00785164-I1
- BIN
- 1063506
- BBL
- 1021420175
- Postal code
- 10033 · 66 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 40
- Proposed dwelling units
- 40