What the filing says
A public-record reading of the proposed work.
Filed herewith Alteration GC application for an exposed party wall repair work as per plans filed. No change in occupancy, use or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story elevator apartment building built in 2024, with 32 homes, on a 12,272 sq ft lot.
- Built
- 2024
- Last altered
- 2024
- Floors
- 7
- Residential units
- 32
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8
- Lot area
- 12,272 sq ft
- Building area
- 51,969 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Aug 13, 2025.
- Construction
Issued Aug 13, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD STRUCT DEFECTS @ BLDG,THE EXPOSED/EXTERIOR PARTY WALL SHARED W/THE ADJ 347 W 51 ST HAD UNSUPPORT ED BRICK MASONRY @ CHIMNEY. OWNER TO IMMED RETAIN NYSPE TO EVAL THE ENTIRE PROPERTY & DETERMINE THE STRUCT STAB OF THE PARTY WALL IMMED INSTALL SAFETY MEASURES AS REQ'D. PERM REPAIR BLDG UNDER PERMIT
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 27, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01310254-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,269 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01310254-I1
- BBL
- 1010420054
- Postal code
- 10019 · 1098 filings
- Review type
- Professional Certification
- Existing stories
- 1
- Proposed stories
- 7
- Existing dwelling units
- 0
- Proposed dwelling units
- 32