What the filing says
A public-record reading of the proposed work.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1927, with 10 homes, on a 3,454 sq ft lot.
- Built
- 1927
- Floors
- 5
- Residential units
- 10
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R7B
- Lot area
- 3,454 sq ft
- Building area
- 14,175 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 8 notices on file; the most recent was issued Jun 6, 2025.
- Immediate
Issued Jun 6, 2025 — REMEDY: ERECT APPROX A TOTAL OF ABOUT 46LF OF SIDEWALK SHEDPARALLEL TO THE FULL BLDG WIDTHAT EXPO 1/ EAST 193 ST. EXTEND SIDEWALK SHED BETW EEN THE CURB LINE AND THE BLDG WALL (ABOUT 16FT WIDTH) AND COVER THE 1 ST FL EGRESS AMND CELLAR EGRESS
- Construction
Issued Jun 2, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#348202 & VIO#042425PI20702SB DATED 04/24/25 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT. AS OF TODAY 06/02/25 THERE ARE NO JOBS FILED IN BIS OR DOBNOW TO REPAIR BLDG. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348202 AND VIO# 042425PI20702SB TO REPAIR BLDG UNDER PERMIT
- Construction
Issued Apr 24, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER. OBSV @ EXP1 CRACKED TERRA COTTA STONE WINDOW SILL @ 3 DIFFERENT LOCATIONS. @ EXP2&4 OBSV CRACKED WINDOW SILLS ON ROOF NEAR EXP4 A LOOSE/HANGING SATELITE ANTENNA OBSV OWNER TO IMMED RETAIN A NYSPE TO EVAL ENTIRE BLDG DETERMINE THE STRUCT STAB&PREPARE/FILE REPAIR DWGS.BLDG T/BE REPAIRED UNDER PERMIT
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01238900-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,548 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01238900-I1
- BIN
- 2016343
- BBL
- 2032760035
- Postal code
- 10458 · 302 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 10
- Proposed dwelling units
- 10