NYC DOB record · B00277561-I1

357 Marcus Garvey Boulevard

357 Marcus Garvey Boulevard, Brooklyn, NY 11221

Alteration filing in Bedford-Stuyvesant (East), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00277561-I1

357 Marcus Garvey Boulevard

Brooklyn, NY 11221

Alteration filing · status dated May 26, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00277561-I1 as a alteration filing at 357 Marcus Garvey Boulevard, Brooklyn, NY 11221. Its latest published status category is Recorded as completed, dated May 26, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
May 26, 2026
Proposed scale
1 proposed dwelling unit
The building, not the filingEvery filing at BIN 3045367, with the parcel and violation recordApplicant of recordSee the 230 filings that name Bitopi Consultants LLC
FiledDec 18, 2019
Current recordRecorded as completed
Proposed scale1 units
Recorded cost$5,000

What the filing says

A public-record reading of the proposed work.

Installation of new sidewalk shed at 357 marcus garvey boulevard brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story place of public assembly built in 1930, on a 117,600 sq ft lot.

Built
1930
Floors
2
Residential units
0
Building type
Place of public assembly
Land use
Public facilities and institutions
Zoning district
R6B
Lot area
117,600 sq ft
Building area
235,200 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 45 notices on file; the most recent was issued May 29, 2025.

  • Construction

    Issued May 29, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED SPALLED/SPALLING BRICK WORK, CRACKED BRICKS, DAMAGED ERODED MISSING MORTAR JOINTS ON ALL EXPOSURES IN MULTIPLE LOCATIONS. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued May 28, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED SPALLED/SPALLING BRICK WORK, CRACKED BRICKS, DAMAGED, ERRODED MISSING MORTAR JOINTS ON ALL EXPOSURES IN MULTIPLE LOCATIONS. REMEDY: REPAIR AND OR REPLACE

  • Local law 62/91 - boilers

    Issued Aug 16, 1993

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00277561-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00277561-I1
BBL
3016490001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1
Sidewalk shed