What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the NYC building code. live load 300 psf
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1915, with 26 homes, on a 4,810 sq ft lot.
- Built
- 1915
- Last altered
- 1975
- Floors
- 5
- Residential units
- 26
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 4,810 sq ft
- Building area
- 21,300 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 7 notices on file; the most recent was issued Aug 19, 2026.
- Construction
Issued Aug 19, 2026 — FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER. OBSERVED @ EXP 1, SPALLING STONE & DETERIORATED/FLAKING PAINT ON DECORATIVE STONE. AT EXP 2, EXPOSED MASONRY & AT EXP 4 CRACK ON STUCCO OBSERVED. AT ROOF VERTICAL CRACK ON PARAPET & BULKHEADS & MISSING METAL COPING SHEET OBSERVED. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Oct 27, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER 28.301 01 OF THE NYC ADMIN CODE. NOTED AT THE TIME OF INSPECTION OBSERVED FROM THE ROOF VERTICAL CRACKS ON THE PARAPET AND BULKHEAD, LOOSE METAL ON TOP OF THE PARAPET, EXPOSED SPALLING BRICKS AND EXPOSED BRICK ALSO. REMEDY: REPAIR AND/OR REPLACE
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00572413-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 68,520 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00572413-I1
- BIN
- 3063198
- BBL
- 3024240031
- Postal code
- 11211 · 3556 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 26
- Proposed dwelling units
- 26








