What the filing says
A public-record reading of the proposed work.
Interior work on 1-family building with remove door, partition, new partition, repair ceiling, replace window, door and painting and exterior work with refacing facade with stucco as per plan.no change of use, egress, or certificate of occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story two-family home built in 1910, on a 1,536 sq ft lot.
- Built
- 1910
- Floors
- 2
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R6B
- Lot area
- 1,536 sq ft
- Building area
- 1,350 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Nov 13, 2025.
- Construction
Issued Nov 13, 2025 — UNSAFE/UNDOCUMENTED EXTENSION & EARTHWORK TO STRUCTURE NOTED : CELLAR IS EXCAVATED APPROX. 2FT. DEEP / WITH POSIBLE UNDER PINNING TO BOTH AJACENT PROPERTY & EXISTING REAR WALL FOR AT EXPOSURE #3 OF BUILDING REMOVE & NEW 2 STORY EXTENSION BUILT ON NEW FOUNDATION AT REAR YARD WITH NO APPROVAL ON RECORDS WITH DOB /COMPROMISED STRUCTURAL
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01247549-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “On Hold – Administrative Action.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 86,497 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01247549-I1
- BBL
- 3008860054
- Postal code
- 11215 · 4712 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 1
- Proposed dwelling units
- 1








