What the filing says
A public-record reading of the proposed work.
Herewith filing for temporary structural shoring at the subcellar level of this existing parking garage. No change to use, occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 14-story condominium built in 2003, with 45 homes, on a 19,537 sq ft lot.
- Built
- 2003
- Floors
- 14
- Residential units
- 45
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C4-2
- Lot area
- 19,537 sq ft
- Building area
- 140,065 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 42 notices on file; the most recent was issued Sep 23, 2026.
- Construction
Issued Sep 23, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. GARAGE CEILING / Q-DECK IS DETERIORATING / SPALLING AND FALLING ONTO PARKED VEHICLES AND GROUND IN VARIOUS LOCATION.
- Failure to submit
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
- Failure to submit
Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01477397-I1.
- Current status updated02
The latest recorded filing status is “Pending CPE/ACPE Assignment.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01477397-I1
- BBL
- 4049707501
- Postal code
- 11354 · 396 filings
- Review type
- Standard Plan Examination
- Existing stories
- 13
- Proposed stories
- 13
- Existing dwelling units
- 46
- Proposed dwelling units
- 46