What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1841, with 6 homes, on a 2,054 sq ft lot.
- Built
- 1841
- Floors
- 3
- Residential units
- 6
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 2,054 sq ft
- Building area
- 4,791 sq ft
- Historic district
- Greenwich Village Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 4 notices on file; the most recent was issued May 7, 2026.
- Construction
Issued May 7, 2026 — CONCRETE CONSTRUCTION. 3 UNDERPINNING PIERS AT EXP 2 BUILT W/O REQUIRED SPECIAL INSPECTIONS PER 1/21/26 RECORDS. REMEDY: COMPLY WITH CODE. HIRE PE TO CERTIFY IN-PLACE WORK & FILE CCD1 TO WAIVE TR2 NOTIFY DEPT ONCE IN-SITU CCD1 IS APPROVED
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01243700-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01243700-I1
- BIN
- 1009526
- BBL
- 1005740026
- Postal code
- 10011 · 648 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 7
- Proposed dwelling units
- 7