What the filing says
A public-record reading of the proposed work.
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM FOR FACADE INSPECTION AT 360 East 137th Street, Bronx, NY 10454
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 19-story elevator apartment building built in 1961, with 709 homes, on a 268,760 sq ft lot.
- Built
- 1961
- Last altered
- 1995
- Floors
- 19
- Residential units
- 709
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R6
- Lot area
- 268,760 sq ft
- Building area
- 977,430 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 9, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 15 open notices on record for this building, out of 25 notices on file; the most recent was issued May 19, 2025.
- Construction
Issued May 19, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TI ME OF INSPECTION,OBSERVED ON EXP1 WEST ELEV:DAMAGED,MISSING MORTAR JOI NTS BENEATH 20TH & 19TH FLOORS WINDOW SILL AT THE SOUTHWEST END OF WES T ELEV.EXP3 EAST ELEV:MISSING WINDOW PANES ON THE 20TH FL.ROOF:SPALLIN G PLASTER BENEATH WATER TOWER SUPPORT DECK.REMEDY:REPAIR OR REPLACE
- No report and / or late filing (facade)
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
- Facade safety program
Issued Feb 20, 2020 — NYCHA CYCLE 8 UNSAFE REPORT FILED
12 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01413284-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01413284-I1
- BIN
- 2093916
- BBL
- 2022980040
- Postal code
- 10454 · 147 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source