What the filing says
A public-record reading of the proposed work.
For removal of non-loadbearing partitions, doors & frames, floor and wall finishes & built-in millwork. no change to use occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 12-story elevator apartment building built in 1926, with 26 homes, on a 7,406 sq ft lot.
- Built
- 1926
- Last altered
- 1982
- Floors
- 12
- Residential units
- 26
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C6-4M
- Lot area
- 7,406 sq ft
- Building area
- 74,368 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 68 notices on file; the most recent was issued Sep 4, 2025.
- Construction
Issued Sep 4, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 1 NORTH ELEVATION DEFECT AT 2FL CORNICE AND WATER TABLE CRACK & DAMAGED JOINTS. DEFECT AT 6FL LINTEL & FLAKING OF PAINT AT 1FL ROOF DAMAGED AND CRACK WINDOW PANE AT M/C ROOM. REMEDY: REPAIR AND/OR REPLACE
- Elevator
Issued Jun 10, 2009
- Elevator
Issued Jun 10, 2009
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01454434-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01454434-I1
- BBL
- 1007590072
- Postal code
- 10018 · 267 filings
- Review type
- Professional Certification
- Existing stories
- 12
- Proposed stories
- 12
- Existing dwelling units
- 26
- Proposed dwelling units
- 26








