What the filing says
A public-record reading of the proposed work.
Mpp#314: the plans enclosed depict the partial demolition by hand and mechanicalmeans. the engineer shall be notified by the contractor of any deviationfrom the approved plan or unexpected conditions.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story garage or fuel station built in 1918, on a 9,415 sq ft lot.
- Built
- 1918
- Last altered
- 2025
- Floors
- 2
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- M1-5/R10
- Lot area
- 9,415 sq ft
- Building area
- 39,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 8 notices on file; the most recent was issued Oct 24, 2024.
- Construction
Issued Oct 24, 2024 — FULL VACATE OF ENTIRE PARKING STRUCTURE 2 STORIES PLUS CELLAR DUE TO THE IMMEDIATE HAZARDS POSED: OBSERVED IN ADEQUATE PROTECTION IN PLACE TO PROTECT THE INSTALLED SHORING POST FROM VEHICULAR IMPACT. THESE CONDITIONS HAVE THEREFORE MADE THE ENTIRE PARKING STRUCTURE UNSAFE TO BE OCCUPIED. REMEDY: VACATE ENTIRE PARKING STRUCTURE
- Construction
Issued Oct 19, 2024 — EMERGENCY WORK ORDER DUE TO CONCRETE SPALLING STUCCO/REPAIRING MATERIAL SPALLING, FACADE BRICK MASONRY BULGED ALSO RUSTED AND LOOSE STEEL PROTECTION OF WINDOW GLASS @ MULT. LOC EXP3 (N.ELEV). REMEDY: IMMEDIATELY TAKE & PROVIDE SAFE MEASURES TO SECURE & PROTECT PUBLIC, ALSO REMOVE /SECURE ALL LOOSE/HANGING MATERIALS
- Construction
Issued Jul 27, 2023 — FAILURE TO MAINTAIN BUILDING WALLS IN A CODE COMPLIANT MANNER. NOTED: BUILDING IN STATE OF DISREPAIR AND DETERIORATED WITH SPALLING CONCRETE THROUGHOUT, MULTIPLE VERTICAL AND HORIZONTAL CRACKS AND MISSING MASONRY COPING STONE AT ROOF LEVEL.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 9, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01413780-I1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 79,351 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01413780-I1
- BBL
- 1004760073
- Postal code
- 10013 · 716 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 0
- Proposed dwelling units
- 0