What the filing says
A public-record reading of the proposed work.
The structural scope of work includes addition of new steel beams and posts to accommodate the enlarged opening at the first floor,design of the stair stringers, and infill of an existing opening at the first floor
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16-story elevator apartment building built in 1929, with 127 homes, on a 10,216 sq ft lot.
- Built
- 1929
- Last altered
- 1986
- Floors
- 16
- Residential units
- 127
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C2-7A
- Lot area
- 10,216 sq ft
- Building area
- 131,476 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 90 notices on file; the most recent was issued May 12, 2014.
- High pressure boiler
Issued May 12, 2014
- Elevator
Issued Jul 13, 2001 — 1P17467
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 4, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01418985-P2.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01418985-P2
- BBL
- 1011690029
- Postal code
- 10024 · 267 filings
- Review type
- Professional Certification
- Existing stories
- 17
- Proposed stories
- 17
- Existing dwelling units
- 79
- Proposed dwelling units
- 79