NYC DOB record · B01410912-I1

365 Clinton Avenue

365 Clinton Avenue, Brooklyn, NY 11238

Alteration filing in Clinton Hill, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01410912-I1

365 Clinton Avenue

Brooklyn, NY 11238

Alteration filing · status dated Aug 27, 2026

Current record
Approved
Proposed scale
14 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01410912-I1 as a alteration filing at 365 Clinton Avenue, Brooklyn, NY 11238. Its latest published status category is Approved, dated Aug 27, 2026. The filing records 14 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 27, 2026
Proposed scale
14 proposed stories and 1 proposed dwelling unit
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 3321876Applicant of recordSee the 1 filings that name Christopher Tavener
FiledJun 25, 2026
Current recordApproved
Proposed scale14 stories
Recorded cost$74,300

What the filing says

A public-record reading of the proposed work.

Interior renovation to include: Enclosing a home office. Demolishing a closet. Demolishing partitions to provide enlarged kitchen. Replacing bathroom fixtures in same location.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 14-story elevator apartment building built in 1945, with 424 homes, on a 84,600 sq ft lot.

Built
1945
Floors
14
Residential units
424
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
84,600 sq ft
Building area
448,000 sq ft
Historic district
Clinton Hill Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 73 notices on file; the most recent was issued Dec 30, 2025.

  • Construction

    Issued Dec 30, 2025 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B00939880-I1 ON 10/22/25. INTENT TO REVOKE APPROVAL AND PERMIT. STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE.

  • Construction

    Issued Dec 30, 2025 — BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDERPERMIT #B00939880-I1 ON 10/22/25. INTENT TO REVOKE APPROVAL AND PERMIT. STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE.

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01410912-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01410912-I1
BBL
3019440004
Review type
Professional Certification
Existing stories
14
Proposed stories
14
Existing dwelling units
1
Proposed dwelling units
1
General construction