What the filing says
A public-record reading of the proposed work.
Emergency immed rmvl of wtr dmgd part'n & ceilg finishes at select unoccupd units to safegrd occupants from dangers of mold. firestopping to remain intact for occupied areas. fire rehab work to be perfrmd at next phase. no chg in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1951, with 93 homes, on a 25,240 sq ft lot.
- Built
- 1951
- Floors
- 6
- Residential units
- 93
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7-1
- Lot area
- 25,240 sq ft
- Building area
- 95,684 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 51 notices on file; the most recent was issued Jun 20, 2026.
- Construction
Issued Jun 20, 2026 — I OBSERVED ON 6TH FLRS WEST SIDE APARTMENTS, GENERAL WIRING, LIGHT FIXTURES, RECEPTACLES AND APPLIANCES DAMAGE DUE TO FIRE AND WATER
- Immediate
Issued Jun 1, 2026 — REMEDY: SEAL ALL ACCESSIBLE OPENINGS
- Construction
Issued Jun 1, 2026 — FTM BLDG IN A SAFE CONDITION-BLDG SUFFERED A FIRE,DAMAGE ON/AROUND 05/07/26@THE REAR EXT.INTERIOR WALL&CEILING FINISHES PARTIALLY DETACHED.BLDG WALL WAS SEALED TO SEPARATE MAIN BLDG.OWNER TO RETAIN NYSPE TO EVAL ENTIRE STRUCT & FILE DWGS TO REPAIR/LEGALIZE THE ENTIRE BLDG,REPAIR/LEGALIZE UNDER PERMIT
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01419926-S1.
- Current status updated02
The latest recorded filing status is “Chief Plan Examiner/ Assistant Chief Plan Examiner Review.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01419926-S1
- BBL
- 4012860030
- Postal code
- 11372 · 215 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 92
- Proposed dwelling units
- 92








