What the filing says
A public-record reading of the proposed work.
Filing for a new commercial kitchen exhaust hood, ductwork at kitchen and exhaust fan on the roof, there is no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1931, with 20 homes, on a 4,700 sq ft lot.
- Built
- 1931
- Floors
- 4
- Residential units
- 20
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- M1-2/R6A
- Lot area
- 4,700 sq ft
- Building area
- 19,600 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 32 open notices on record for this building, out of 33 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Structurally compromised
Issued Apr 15, 2024 — FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.
- Construction
Issued Mar 22, 2024 — FTM.BLDG SFFRD A FIRE ON 2/21/24.ROOF OPEN OVER 1,2,&3 APT LINES CHARRN OF JOISTS OVER 1STFL COMMERCIAL SPACE.MINOR SMOKE&FIRE DAMAGE@ 1,2,&3 APT LINES ON 2ND-4TH FL.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #022224FEU40102AK (CONTROL #343460)
29 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01389469-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01389469-I1
- BIN
- 4004509
- BBL
- 4003700032
- Postal code
- 11101 · 517 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 20
- Proposed dwelling units
- 20








