What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy-duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the 2022 NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story condominium built in 2019, with 6 homes, on a 3,751 sq ft lot.
- Built
- 2019
- Floors
- 4
- Residential units
- 6
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R6B
- Lot area
- 3,751 sq ft
- Building area
- 10,137 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 7 notices on file; the most recent was issued Oct 20, 2026.
- Construction
Issued Oct 20, 2026 — EMERGENCY WORK ORDER-IMMED HAZ CONDITIONS 4TH FLR BALCONY SAGGING, THE BALCONY IS UNSTABLE AND AT RISK OF COLLAPSE. OWNER TO IMMED RETAIN DOB REG GC TO INSTALL SIDEWALK SHED AT FULL LENGTH OF EXP1 PLUS 5FT EXTENSION. START WORK IMMED, CONTINUE DAILY UNTIL COMPLETE,SUBMIT DAILY PHOTOS TO DOB, FILE APPLICATION W/IN 2 DAYS FROM START OF WORK
- Construction
Issued Oct 20, 2026 — FTM BLDG IN SAFE CONDITION-DURING PROACTIVE INSP HAZ CONDITIONS WERE FOUND. 4FL BALCONY IS SAGGING, THIS IS AN IMMED HAZ TO PUBLIC SAFETY ANYONE UNDER THIS BALCONY IS @ RISK INCL ANYONE ON 3FL BALCONY OR THE PUBLIC S/W INFRONT OF BLDG.PARTIAL VACATE AT 3RD FLOOR BALCONY UNTIL HAZARDOUS CONDITIONS HAVE BEEN REMEDIED
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01481703-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 90,393 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01481703-I1
- BIN
- 4044233
- BBL
- 4017687503
- Postal code
- 11368 · 424 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 6
- Proposed dwelling units
- 6








