NYC DOB record · M01057435-I1

370 East 76 Street

370 East 76 Street, Manhattan, NY 10021

Alteration filing in Upper East Side-Lenox Hill-Roosevelt Island, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01057435-I1

370 East 76 Street

Manhattan, NY 10021

Alteration filing · status dated Aug 21, 2026

Current record
Approved
Proposed scale
19 stories
Dwelling units
369
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01057435-I1 as a alteration filing at 370 East 76 Street, Manhattan, NY 10021. Its latest published status category is Approved, dated Aug 21, 2026. The filing records 19 proposed stories and 369 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 21, 2026
Proposed scale
19 proposed stories and 369 proposed dwelling units
FiledJun 10, 2024
Current recordApproved
Proposed scale19 stories
Recorded cost$777,654

What the filing says

A public-record reading of the proposed work.

Roof replacement at c-wing & b-wing bulkhead. no change to use, egress, or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 19-story elevator apartment building built in 1966, with 369 homes, on a 35,975 sq ft lot.

Built
1966
Floors
19
Residential units
369
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
C2-8
Lot area
35,975 sq ft
Building area
386,435 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 98 notices on file; the most recent was issued Dec 4, 2025.

  • Construction

    Issued Dec 4, 2025 — I OBSERVED IN APARTMENT #205 WIRES AND LIGHT FIXTURES IN KITCHEN AREA DAMAGE DUE TO FIRE.

  • Construction

    Issued Jun 17, 2025 — BUILDING PARKING STRUCTURE IS IN STATE OF DISREPAIR WITH DETERIORATING CONCRETE CEILINGS WITH EXPOSURE REBAR AND COLUMNS DETERIORATING THROUGHOUT LOWER LEVEL 1 AND LOWER LEVEL 2 OF PARKING GARAGE. ALSO OBSERVED STEP CRACKS AND MISSING MORTAR BY CMU BLOCK WALLS.

  • Low pressure boiler

    Issued Apr 25, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION

  • 3 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01057435-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01057435-I1
BIN
1045148
BBL
1014500023
Review type
Standard Plan Examination
Existing stories
19
Proposed stories
19
Existing dwelling units
369
Proposed dwelling units
369
General construction