NYC DOB record · B00616619-I1

370 Ocean Parkway

370 Ocean Parkway, Brooklyn, NY 11218

Alteration filing in Kensington, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00616619-I1

370 Ocean Parkway

Brooklyn, NY 11218

Alteration filing · status dated Jul 18, 2023

Current record
Recorded as completed
Proposed scale
12 stories
Dwelling units
133
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00616619-I1 as a alteration filing at 370 Ocean Parkway, Brooklyn, NY 11218. Its latest published status category is Recorded as completed, dated Jul 18, 2023. The filing records 12 proposed stories and 133 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Jul 18, 2023
Proposed scale
12 proposed stories and 133 proposed dwelling units
The building, not the filingwhat it sold for and every filing at BIN 3126159Applicant of recordSee the 4 filings that name B-cubed Engineering LLC
FiledFeb 16, 2022
Current recordRecorded as completed
Proposed scale12 stories
Recorded cost$400,000

What the filing says

A public-record reading of the proposed work.

Structural modifications to existing balcony enclosures pre-dating building bulletin 2014-024 dated december 3, 2014. 2. sound out areas of concrete at balcony slab and repair with restoration mortar and perform miscellaneous facade repairs.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story elevator apartment building built in 1961, with 133 homes, on a 33,000 sq ft lot.

Built
1961
Floors
12
Residential units
133
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7A
Lot area
33,000 sq ft
Building area
111,861 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 34 notices on file; the most recent was issued Jun 24, 2022.

  • Construction

    Issued Jun 24, 2022 — DUE TO HAZARD POSED BY THE CRACKED CONCRETE SLABS AND BROKEN GLASS PANELS/RAILING ON THE BALCONIES ON THE EAST ELEVATION AND WEST ELEV REMEDY: VACATE ALL BALCONIES ON THE EAST ELEVATION AND WEST ELEVATION UNTIL CONDITIONS ARE REMEDIED AND BALCONIES ARE MADE SAFE

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00616619-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00616619-I1
BBL
3053740021
Review type
Standard Plan Examination
Existing stories
12
Proposed stories
12
Existing dwelling units
133
Proposed dwelling units
133
General constructionStructural work