NYC DOB record · X01461659-I1

3703 Provost Avenue

3703 Provost Avenue, Bronx, NY 10466

Alteration filing in Eastchester-Edenwald-Baychester, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 27, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01461659-I1

3703 Provost Avenue

Bronx, NY 10466

Alteration filing · status dated Oct 22, 2026

Current record
Approved
Proposed scale
1 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01461659-I1 as a alteration filing at 3703 Provost Avenue, Bronx, NY 10466. Its latest published status category is Approved, dated Oct 22, 2026. The filing records 1 proposed story.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 22, 2026
Proposed scale
1 proposed story
Applicant of recordSee the 12 filings that name Build Tech Professional Corp
FiledSep 17, 2026
Current recordApproved
Proposed scale1 stories
Recorded cost$81,600

What the filing says

A public-record reading of the proposed work.

Replace HVAC units with split units on existing steel dunnage.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 1-story store building built in 1964, on a 11,225 sq ft lot.

Built
1964
Floors
1
Residential units
0
Building type
Store building
Land use
Commercial and office
Zoning district
M1-1
Lot area
11,225 sq ft
Building area
11,225 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 27, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01461659-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01461659-I1
BIN
2066528
BBL
2049520017
Review type
Standard Plan Examination
Existing stories
1
Proposed stories
1
Existing dwelling units
0
Proposed dwelling units
0
General construction