What the filing says
A public-record reading of the proposed work.
Facade repair which includes brick repointing,lintel replacement, stucco repair, sill replacementand brick work as per plans. no change in buildinguse, occupancy or egress
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1931, with 24 homes, on a 6,550 sq ft lot.
- Built
- 1931
- Floors
- 4
- Residential units
- 24
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6B
- Lot area
- 6,550 sq ft
- Building area
- 14,760 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 8 notices on file; the most recent was issued Oct 27, 2020.
- Construction
Issued Oct 27, 2020 — EMERG WORK.EXP1 FACADE DISREPR STATE WITH BRCKS BULG&LEAN OUT W/WINDOW LINTELS & SILLS ASKEW.BRKS&APPRTNCES FACADE ELEMENTS DETACHING&FALLING FROM BLDG.POSING RISK TO OCCUPANTS & PASSERS BY.OWNR IMMED ERECT HEAVY DUTY SIDEWALK SHED@EXP1-COVER ENTIRE BLDG WIDTH+5'OVRHNG EXTENS BEYOND PROP LINS@ EXPOS 2&4 EXTEND 10'BLDG FACE.FILE APPLIC W/IN 2 BUSN DAYS
- Construction
Issued Oct 27, 2020 — FTM BLDG SAFE COND:EXP1 BRCK FACDE STATE DISREPR W/BULG BRCKS LEAN OUT W/WINDW LINTLS&SILLS.EXTR WALLS&PARPTS ARND@EXP2 DETER MORTR.CELLAR WD SHOR PREV INSTL UNDR PRMT SUFFRD PHYS.&WTR DMG.FIRE PROOF MISS@CELLAR CEIL.WTR ROOF DMG WAL FINS.PUBL STAIR HAL.OWN RETN NYSPE&DOB REG CONTR EVAL ENTR BLD&RPR UNDR PRMT.FIL RPRS 12/1/20.BEGN 1/2/21.CMPLT 6/1/21
- Local law 62/91 - boilers
Issued Aug 16, 1993
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00480962-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00480962-I1
- BBL
- 3011600030
- Postal code
- 11238 · 2035 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 23
- Proposed dwelling units
- 23








