NYC DOB record · B00173969-I1

378 Schermerhorn Street

378 Schermerhorn Street, Brooklyn, NY 11217

Alteration filing in Downtown Brooklyn-Dumbo-Boerum Hill, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00173969-I1

378 Schermerhorn Street

Brooklyn, NY 11217

Alteration filing · status dated Jan 20, 2021

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00173969-I1 as a alteration filing at 378 Schermerhorn Street, Brooklyn, NY 11217. Its latest published status category is Approved, dated Jan 20, 2021. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Jan 20, 2021
Proposed scale
Not stated in this filing
Complete building dossierView all 2 filings associated with BIN 3000600Applicant of recordSee the 651 filings that name Baileys Engineering PC
FiledJun 12, 2019
Current recordApproved
Proposed scaleNot specified
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of fence as per plans. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00173969-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00173969-I1
BBL
Empty in the source
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source