What the filing says
A public-record reading of the proposed work.
Remove & replace existing roofing systems, parapets replacement , Brick & Masonry repairs and replacement of all school Windows And bulkhead doors replacement as per plans filed herewith.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story educational building built in 1925, on a 322,000 sq ft lot.
- Built
- 1925
- Last altered
- 2010
- Floors
- 3
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- R3-2
- Lot area
- 322,000 sq ft
- Building area
- 211,552 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 39 open notices on record for this building, out of 142 notices on file; the most recent was issued Oct 12, 2021.
- Elevator
Issued Oct 12, 2021
- Elevator
Issued Oct 11, 2021
- Elevator
Issued Dec 27, 2019
36 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 3, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00955426-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00955426-I1
- BBL
- 3067880001
- Postal code
- 11229 · 1563 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 0
- Proposed dwelling units
- 0