NYC DOB record · B00323650-I1

379 South 1 Street

379 South 1 Street, Brooklyn, NY 11211

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00323650-I1

379 South 1 Street

Brooklyn, NY 11211

Alteration filing · status dated Mar 30, 2022

Current record
Recorded as completed
Proposed scale
4 stories
Dwelling units
9
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00323650-I1 as a alteration filing at 379 South 1 Street, Brooklyn, NY 11211. Its latest published status category is Recorded as completed, dated Mar 30, 2022. The filing records 4 proposed stories and 9 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Mar 30, 2022
Proposed scale
4 proposed stories and 9 proposed dwelling units
The building, not the filingEvery filing at BIN 3062875, with the parcel and violation recordApplicant of recordSee the 460 filings that name Structural Engineering Technologies
FiledJul 29, 2020
Current recordRecorded as completed
Proposed scale4 stories
Recorded cost$2,500

What the filing says

A public-record reading of the proposed work.

Structural application filed in conjunction to alt 1 job #321989498

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1950, with 9 homes, on a 2,042 sq ft lot.

Built
1950
Last altered
2020
Floors
4
Residential units
9
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
2,042 sq ft
Building area
7,147 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00323650-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00323650-I1
BBL
3023990021
Review type
Standard Plan Examination
Existing stories
2
Proposed stories
4
Existing dwelling units
1
Proposed dwelling units
9
Structural work