NYC DOB record · B01407721-I1

3818 Fort Hamilton Parkway

3818 Fort Hamilton Parkway, Brooklyn, NY 11218

Alteration filing in Sunset Park (East)-Borough Park (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 13, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01407721-I1

3818 Fort Hamilton Parkway

Brooklyn, NY 11218

Alteration filing · status dated Nov 11, 2026

Current record
Recorded as completed
Proposed scale
3 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01407721-I1 as a alteration filing at 3818 Fort Hamilton Parkway, Brooklyn, NY 11218. Its latest published status category is Recorded as completed, dated Nov 11, 2026. The filing records 3 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 11, 2026
Proposed scale
3 proposed stories and 2 proposed dwelling units
Applicant of recordSee the 1144 filings that name Always Fast Services Corp
FiledMay 28, 2026
Current recordRecorded as completed
Proposed scale3 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Jul 2, 2026.

  • Construction

    Issued Jul 2, 2026 — FTC W/COMMISSIONER'S ORDER 370502 VIO#052626PI31201HZ DATED 5/26/26 REQUIRING OWNER TO PROVIDE CORRECCTIVE ACTION PLAN BY 6/26/26. AS OF 7/2/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER 370502 VIO#052626PI31201HZ

  • Construction

    Issued May 26, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD AT TIME OF INSPECTION DISLODGED METAL ORNAMENTAL MOULDINGS ABOVE 3FL WINDOW AND 1/4 CORNER AT RISK OF FALLING OFF AT ANYTIME. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN

  • Construction

    Issued May 26, 2026 — EMERGENCY WORK ORDER-INTALL SIDEWALK SHED IMMED. OBSVD DISLODGED ORNAMENTAL COMPONENTS AT RISK OF FALLING ONTO SIDEWALK. HAZ CONDITION FOR THE PUBLIC. INSTALL STALL S/W SHED IMMED FULL LENTH OF BLDG WITH 5FT OVERLAPPING ON EACH SIDE TOTAL LENGTH 30FT AT FRONT EXP ELEVATION 01 START WORK IMMED & CONTINUE UNTIL COMPLETE,SUBMIT DAILY UPDATES

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 13, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01407721-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01407721-I1
BIN
3122917
BBL
3052880049
Review type
Professional Certification
Existing stories
3
Proposed stories
3
Existing dwelling units
2
Proposed dwelling units
2
Sidewalk shed