What the filing says
A public-record reading of the proposed work.
Installation of a temporary construction fence in relation to application # 322093845
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story garage or fuel station built in 1931, on a 4,378 sq ft lot.
- Built
- 1931
- Floors
- 1
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Transportation and utility
- Zoning district
- R6
- Lot area
- 4,378 sq ft
- Building area
- 1,404 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Jun 21, 2024.
- Construction
Issued Jun 21, 2024 — THE BOROUGH COMMISSION HAS ORDERED ALL WORK STOP UNDER APPLICATION # 322093845 IMMEDIATELY DUE TO THE APPLICANT OF RECORD HAS WITHDRAWN FROM THE PROJECT THEREFORE, THE APPLICANT FAILS TO SET FORTH THE FULL NAME ADDRESS, TELEPHONE NUMBER EMAIL ADDRESS OF THE APPLICANT IN VIOLATION OF SECTION 28-104.8.3.
- Fail to certify class
Issued Sep 15, 2021 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Mar 6, 1992
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00477460-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00477460-I1
- BIN
- 3101023
- BBL
- 3046440001
- Postal code
- 11212 · 1713 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0