What the filing says
A public-record reading of the proposed work.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress under this application, all work to comply with chapter 33 of nycbc.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story mainly residential with some commercial built in 1910, with 6 homes, on a 2,300 sq ft lot.
- Built
- 1910
- Floors
- 4
- Residential units
- 6
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6B
- Lot area
- 2,300 sq ft
- Building area
- 7,130 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 17 open notices on record for this building, out of 42 notices on file; the most recent was issued Aug 29, 2026.
- Construction
Issued Aug 29, 2026 — EWO:DUE TO CRACKING/SPALLING MASONRY STUCCO, CRACKING STONE LINTEL MULT LOCS @ EXP1,4 W&S ELEVS. REMEDY:OWNER TO IMMED PROVIDE SIDEWALK SHED/ADEQ SAFETY MEASURES @ EXP1,4 W&S ELEVATIONS TO PROTECT THE PUBLI & PROP AND REPAIR/REPLACE DAMAGED MASONRY STUCCO, CRACKING STONE LINTEL: SPALLING BRICKS, DEFECTED MORTAR JTS. OBTAIN WORK PERMIT
- Construction
Issued Aug 29, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED SPALLED MORTAR JOINTS & PAINT. PROTECTION AT THE PARAPET WALL ON TOP LEVEL AS OBSERVED DAMAGED & FALLING MORTAR JOINT @ EXPOSURE #1 AT THE FIRST & SECOND FLOOR WITH NO PROTECTION PROVIDED. REMEDY: REPAIR AND/OR REPLACE DEFECTED FACADE
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
14 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01461488-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01461488-I1
- BIN
- 3325092
- BBL
- 3016540081
- Postal code
- 11221 · 3260 filings
- Review type
- Professional Certification
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 6
- Proposed dwelling units
- 6








