NYC DOB record · B00340936-I1

3855 Shore Parkway

3855 Shore Parkway, Brooklyn, NY 11235

Alteration filing in Sheepshead Bay-Manhattan Beach-Gerritsen Beach, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00340936-I1

3855 Shore Parkway

Brooklyn, NY 11235

Alteration filing · status dated Feb 27, 2024

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
153
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00340936-I1 as a alteration filing at 3855 Shore Parkway, Brooklyn, NY 11235. Its latest published status category is Recorded as completed, dated Feb 27, 2024. The filing records 153 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Feb 27, 2024
Proposed scale
153 proposed dwelling units
Complete building dossierView all 3 filings associated with BIN 3247918Applicant of recordSee the 19 filings that name James H. Fahey
FiledApr 28, 2020
Current recordRecorded as completed
Proposed scale153 units
Recorded cost$24,200

What the filing says

A public-record reading of the proposed work.

Verizon - Replacement of existing antennas and RRH units on the roof. Install 2 microwave dishes.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1965, with 153 homes, on a 72,051 sq ft lot.

Built
1965
Floors
6
Residential units
153
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R3-2
Lot area
72,051 sq ft
Building area
153,193 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 11 open notices on record for this building, out of 33 notices on file; the most recent was issued Oct 4, 2023.

  • Fail to certify class

    Issued Oct 4, 2023 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • Construction

    Issued Jan 5, 2023 — EMERGENCY WORK ORDER DUE TO SPALLLED BALCONY SLAB WITH EXPOSED ON J LINE OF EXP 1A. REMEDY: TAKE AND PROVIDE SAFETY MEASURES TO SECURE PUBLIC SAFETY. REMOVE/SECURE ANDY LOOSE OR HANGING DEBRIS ON SLAB

  • No report and / or late filing (facade)

    Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022

  • 8 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00340936-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00340936-I1
BBL
3088060140
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
153
Proposed dwelling units
153