NYC DOB record · B00570662-I1

389 Jefferson Avenue

389 Jefferson Avenue, Brooklyn, NY 11221

Alteration filing in Bedford-Stuyvesant (West), Brooklyn. The latest DOB status is on hold - pending supersede of special inspector.

The filing is paused until an administrative step is completed. It has not been rejected. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00570662-I1

389 Jefferson Avenue

Brooklyn, NY 11221

Alteration filing · status dated May 22, 2026

Current record
Under review
Proposed scale
4 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00570662-I1 as a alteration filing at 389 Jefferson Avenue, Brooklyn, NY 11221. Its latest published status category is Under review, dated May 22, 2026. The filing records 4 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
May 22, 2026
Proposed scale
4 proposed stories and 1 proposed dwelling unit
The building, not the filingEvery filing at BIN 3052095, with the parcel and violation recordApplicant of recordSee the 21 filings that name Telyk NYC
FiledSep 17, 2021
Current recordUnder review
Proposed scale4 stories
Recorded cost$25,000

What the filing says

A public-record reading of the proposed work.

Installation of rear yard shallow and new footing in basement

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story two-family home built in 1915, on a 2,000 sq ft lot.

Built
1915
Last altered
2019
Floors
3
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R6B
Lot area
2,000 sq ft
Building area
3,797 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 6 notices on file; the most recent was issued Jan 3, 2022.

  • Construction

    Issued Jan 3, 2022

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00570662-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “On Hold - Pending Supersede of Special Inspector.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00570662-I1
BBL
3018300055
Review type
Standard Plan Examination
Existing stories
4
Proposed stories
4
Existing dwelling units
2
Proposed dwelling units
1
General constructionFoundation workEarthwork