NYC DOB record · S01345516-S1

3943 Victory Boulevard

3943 Victory Boulevard, Staten Island, NY 10314

New building filing in New Springville-Willowbrook-Bulls Head-Travis, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 30, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01345516-S1

3943 Victory Boulevard

Staten Island, NY 10314

New building · status dated Sep 25, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01345516-S1 as a new building at 3943 Victory Boulevard, Staten Island, NY 10314. Its latest published status category is Approved, dated Sep 25, 2026. The filing records 3 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 25, 2026
Proposed scale
3 proposed stories and 2 proposed dwelling units
Applicant of recordSee the 83 filings that name C&p Design Consultants
FiledSep 25, 2026
Current recordApproved
Proposed scale3 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Proposed Installation of new 18' combined (shared) curb cut associated with new NB S01345516-I1 and filed in conjunction with 3947 Victory Boulevard NB#S01345509-i1

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story two-family home built in 2026, on a 3,647 sq ft lot.

Built
2026
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R3A
Lot area
3,647 sq ft
Building area
2,830 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01345516-S1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01345516-S1
BIN
5177447
BBL
5027830050
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
3
Existing dwelling units
Empty in the source
Proposed dwelling units
2