What the filing says
A public-record reading of the proposed work.
Filing for facade repairs work that includes cut and point brick mortar joints, replacement of steel lintels, repair of precast concrete windowsills(s) and miscellaneous brick masonry repairs throughout the building,
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1928, with 86 homes, on a 20,300 sq ft lot.
- Built
- 1928
- Floors
- 6
- Residential units
- 86
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 20,300 sq ft
- Building area
- 106,100 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 27 notices on file; the most recent was issued Jun 30, 2026.
- Construction
Issued Jun 30, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #022025CFA08 02DD REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES BY PE/RA AND SUBMIT A REPORT TO FACADES VIA EMAIL BY 3/7/25.AS OF 6/30/26 NO HANDS ON INSPECTION REPORT SUBMITTED TO FACADES UNIT.REMEDY:COMPLY WITH DOB VIOLATION #022025CFA0802DD IMMEDIATELY
- Construction
Issued Feb 20, 2025 — FTM FACADE & APPURT DUE TO CRACKED/SPALLING BRICK & MORTAR JOINTS MULTI LOCAT & CRACKED BULGIN BRICK EXP1 EAST 5 FL WINDOW.REMDY:RETAIN A NYS RDP WITH QEWI CERTIFICATN TO INSPECT/EVALUATE 100% HANDS ON THE MASONRY FACADE TO DETERMINE CODE COMPLIANCE & ENSURE STABILITY.INSTALL PUBLIC PROTECTN & SUBMIT REPORT TO FACADE@BUILDING.N.G BY 3/7/25
- Construction
Issued Feb 20, 2025 — EWO DUE TO CRACKED/SPALLING BRICK MULTI LOCAT, CRACKED/BULGING BRICK, BRICK PUSHING OFF WINDOW OF 5TH FL WINDOW EXP 1 EAST NORTHEAST END REMDY:IMMEDTLY TAKE/PROVIDE ADEQUATE SAFETY MEAS @ EXP 1 EAST (GOUVERN EUR AVE) & INSTALL PUBLIC PROTECTN. MAKE IMMEDIATE REPAIRS TO DEFECTIV FACADE UNDR THE SUPERV OF NYS LP & FILE AN UNSAFE FISP REPORT
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01473558-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01473558-I1
- BBL
- 2032520260
- Postal code
- 10463 · 453 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 86
- Proposed dwelling units
- 86