NYC DOB record · B00608217-I1

396 New Lots Avenue

396 New Lots Avenue, Brooklyn, NY 11207

New building filing in East New York-New Lots, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00608217-I1

396 New Lots Avenue

Brooklyn, NY 11207

New building · status dated May 25, 2022

Current record
Approved
Proposed scale
6 stories
Dwelling units
10
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00608217-I1 as a new building at 396 New Lots Avenue, Brooklyn, NY 11207. Its latest published status category is Approved, dated May 25, 2022. The filing records 6 proposed stories and 10 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
May 25, 2022
Proposed scale
6 proposed stories and 10 proposed dwelling units
Applicant of recordSee the 278 filings that name Bricolage Designs
FiledOct 11, 2021
Current recordApproved
Proposed scale6 stories
Recorded cost$100

What the filing says

A public-record reading of the proposed work.

Proposed new six story mixed use building

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00608217-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00608217-I1
BIN
3429178
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
6
Existing dwelling units
Empty in the source
Proposed dwelling units
10
General constructionStructural workFoundation workEarthworkmechanical