What the filing says
A public-record reading of the proposed work.
Proposed installation of plywood construction fence as per plan.
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2.75-story two-family home built in 1920, on a 4,363 sq ft lot.
- Built
- 1920
- Floors
- 2.75
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R7-1
- Lot area
- 4,363 sq ft
- Building area
- 4,111 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 6 notices on file; the most recent was issued Sep 24, 2025.
- Construction
Issued Sep 24, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#341571,VIO#062625PI20801SB DATED 06/26/25 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT AS OF 09/24/25 NO PERMIT ISSUED FROM DOB-BIS OR DOBNOW SYSTEM FOR REPAIRING BLDG. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#341571 VIO# 062625PI20801SB TO REPAIR THE BLDG UNDER PERMIT
- Construction
Issued Jun 26, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER. OBSVD MASONRY CRACKS @ EXP2&4 THE MASONRY WALL CRACKS ARE SPALLING AND WERE PREVIOUSLY INADEQUATELY REPAIRED AND ARE REOPENING. OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLDG & FILE REPAIR DWGS. BLDG TO BE PERMANENTLY REPAIRED UNDER PERMIT STARTING AUGUST 11,2025 & COMPLETED/SIGNED OFF BY SEPTEMBER 19, 2025
- Construction
Issued Jul 16, 2008
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01444148-S1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01444148-S1
- BIN
- 2015468
- BBL
- 2032520172
- Postal code
- 10463 · 132 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- Empty in the source