What the filing says
A public-record reading of the proposed work.
General Construction for facade repair and structural work for the 1st and 2nd floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story warehouse built in 1928, on a 14,250 sq ft lot.
- Built
- 1928
- Floors
- 2
- Residential units
- 0
- Building type
- Warehouse
- Land use
- Industrial and manufacturing
- Zoning district
- M1-4/R6A
- Lot area
- 14,250 sq ft
- Building area
- 15,385 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Jan 9, 2026.
- Construction
Issued Jan 9, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#348412 VIO#121825PI40101SB DATED 12/18/2025 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 12/29/2025 AS OF 01/09/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348412 VIO#121925PI40101SB
- Construction
Issued Dec 18, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD BRICK MSONRY BULGING/CRACKED NEAR PARAPET OF EXP1. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING 2024. SUBMIT ANNUAL PARPAET OBSERVATION REPORT FOR 2024-2026 O BE REC'D BY DOB NO LATER THAN JANUARY 1 2026
- Construction
Issued Dec 18, 2025 — CORRECTIVE ACTION PLAN REQ'D(7 DAY CAP)OBSVD @ EXP1 BULGING/CRACKED BRICK MASONRY @ PARAPET. @ EXP2 OBSVD SEVERAL HAIR LINE BRICK MASONRY CRACKS @ MULT LOCATIONS. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 12/29/25 ADDRESSING ALL DONDITIONS W/PLANS/PHOTOS
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01377711-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01377711-I1
- BIN
- 4010883
- BBL
- 4006690041
- Postal code
- 11101 · 546 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 0
- Proposed dwelling units
- 0