NYC DOB record · Q01461144-I1

40-28 Main Street

40-28 Main Street, Queens, NY 11354

Alteration filing in Flushing-Willets Point, Queens. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01461144-I1

40-28 Main Street

Queens, NY 11354

Alteration filing · status dated Sep 18, 2026

Current record
Approved
Proposed scale
2 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01461144-I1 as a alteration filing at 40-28 Main Street, Queens, NY 11354. Its latest published status category is Approved, dated Sep 18, 2026. The filing records 2 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 18, 2026
Proposed scale
2 proposed stories
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 4114142Applicant of recordSee the 574 filings that name Fl&m Engineering Design &inspection
FiledSep 17, 2026
Current recordApproved
Proposed scale2 stories
Recorded cost$10,000

What the filing says

A public-record reading of the proposed work.

Installation of sidewalk shed, ohp and pipe scaffold as per plans. sidewalk shed live load will be 300 psf, all equipment shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story store building built in 1931, on a 2,730 sq ft lot.

Built
1931
Last altered
1990
Floors
2
Residential units
0
Building type
Store building
Land use
Commercial and office
Zoning district
C4-2
Lot area
2,730 sq ft
Building area
6,833 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 9 notices on file; the most recent was issued Nov 25, 2025.

  • Construction

    Issued Nov 25, 2025 — EMERGENCY WORK ORDER DUE TO SHIFTED STONE & BRICKWORK & SPALLING MORTAR JOINTS @ SW CORNER OF EXP#2 SOUTH ELEV & EXP#3 WEST ELEVATION CONDITION IS ABOVE ABOVE ENTRANCE FOR SUBWAY & POSES HAZARDOUS RISK FOR PEDESTRIANS. REMEDY:IMMEDIATELY REMOVE LOOSE MATERIAL &INSTALL SIDEWALK SHED SW CORNER EXP@2 & 3. U/DIRECTION OF LICENSED PROFESSIONA

  • Construction

    Issued Nov 25, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED DAMAGED/SPALLING MORTAR JOINTS ON EXPOSURE 1 AT ROOF LEVEL. ALSO SHIFTED STONE/BRICK WORK ON EXPOSURE 2 AT ROOF LEVEL. REMEDY: REPAIR AND OR REPLACE

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01461144-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01461144-I1
BBL
4050370055
Review type
Professional Certification
Existing stories
2
Proposed stories
2
Existing dwelling units
0
Proposed dwelling units
0
Sidewalk shedScaffolding