NYC DOB record · Q00622137-I1

40-50 68 Street

40-50 68 Street, Queens, NY 11377

Alteration filing in Woodside, Queens. The latest DOB status is on hold – administrative action.

The filing is paused until an administrative step is completed. It has not been rejected. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q00622137-I1

40-50 68 Street

Queens, NY 11377

Alteration filing · status dated Nov 19, 2026

Current record
Under review
Proposed scale
4 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q00622137-I1 as a alteration filing at 40-50 68 Street, Queens, NY 11377. Its latest published status category is Under review, dated Nov 19, 2026. The filing records 4 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Nov 19, 2026
Proposed scale
4 proposed stories and 3 proposed dwelling units
Applicant of recordSee the 115 filings that name Lmw Engineering Group LLC
FiledOct 30, 2021
Current recordUnder review
Proposed scale4 stories
Recorded cost$50,000

What the filing says

A public-record reading of the proposed work.

This job is a partial demolition of a two (2) story masonry building.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 2017, with 3 homes, on a 1,915 sq ft lot.

Built
2017
Floors
4
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R5D
Lot area
1,915 sq ft
Building area
3,680 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q00622137-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “On Hold – Administrative Action.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q00622137-I1
BIN
4607815
BBL
4012990053
Review type
Professional Certification
Existing stories
4
Proposed stories
4
Existing dwelling units
3
Proposed dwelling units
3
General construction