What the filing says
A public-record reading of the proposed work.
The purpose of this project is to legalize the rear porch enclosure . no change to egress, occupancy, or use.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story two-family home built in 1985, on a 6,500 sq ft lot.
- Built
- 1985
- Floors
- 1
- Residential units
- 2
- Building type
- Two-family home
- Land use
- One and two family homes
- Zoning district
- R3X
- Lot area
- 6,500 sq ft
- Building area
- 2,250 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 26, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Oct 14, 2025.
- Construction
Issued Oct 14, 2025 — ATOI OBSERVED AN UNPERMITTED 50 X 12 (600SF)HORIZONTAL AND VERTICAL EXTENSION AT REAR EXP 3. SECOND FLOOR IS SUPPORTED BY 6X6 POSTS. NO PLANS ON FILE. NO DETAILS AS TO FOOTINGS, CONNECTIONS, BEAMS, POST SIZING ETC. STRUCTURAL STABILITY IS IN QUESTION.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing S01333681-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- S01333681-I1
- BIN
- 5105231
- BBL
- 5060460042
- Postal code
- 10312 · 230 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 2
- Proposed dwelling units
- 2