NYC DOB record · M01397349-S2

40 Fifth Avenue

40 Fifth Avenue, Manhattan, NY 10011

Alteration filing in Greenwich Village, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01397349-S2

40 Fifth Avenue

Manhattan, NY 10011

Alteration filing · status dated Aug 27, 2026

Current record
Approved
Proposed scale
15 stories
Dwelling units
58
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01397349-S2 as a alteration filing at 40 Fifth Avenue, Manhattan, NY 10011. Its latest published status category is Approved, dated Aug 27, 2026. The filing records 15 proposed stories and 58 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 27, 2026
Proposed scale
15 proposed stories and 58 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1009539Applicant of recordSee the 74 filings that name Charles G. Michel Engineering, PC.
FiledJun 18, 2026
Current recordApproved
Proposed scale15 stories
Recorded cost$30,000

What the filing says

A public-record reading of the proposed work.

Plumbing work proposed for an existing apartment. No change of use, occupancy or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story elevator apartment building built in 1929, with 80 homes, on a 12,365 sq ft lot.

Built
1929
Last altered
1987
Floors
15
Residential units
80
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
12,365 sq ft
Building area
141,877 sq ft
Historic district
Greenwich Village Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 10 open notices on record for this building, out of 54 notices on file; the most recent was issued Feb 25, 2022.

  • Hazardous condition (facade)

    Issued Feb 25, 2022 — CYCLE 9A UNSAFE REPORT FILED

  • (other bldgs types) - elevator affirmation of

    Issued Nov 14, 2016 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST

  • (other bldgs types) - elevator affirmation of

    Issued Nov 14, 2016 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST

  • 7 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01397349-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01397349-S2
BBL
1005740039
Review type
Standard Plan Examination
Existing stories
15
Proposed stories
15
Existing dwelling units
58
Proposed dwelling units
58
plumbing