What the filing says
A public-record reading of the proposed work.
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 44th floor as per plans filed herewith. no change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 63-story office building built in 1930, on a 34,360 sq ft lot.
- Built
- 1930
- Floors
- 63
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C5-5
- Lot area
- 34,360 sq ft
- Building area
- 1,061,286 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 519 notices on file; the most recent was issued Jul 11, 2024.
- Hazardous condition (facade)
Issued Jul 11, 2024 — CYCLE 9C UNSAFE REPORT FILED
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
- Elevator
Issued Jan 28, 2020
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01453725-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01453725-I1
- BIN
- 1001018
- BBL
- 1000430002
- Postal code
- 10005 · 126 filings
- Review type
- Professional Certification
- Existing stories
- 70
- Proposed stories
- 70
- Existing dwelling units
- 0
- Proposed dwelling units
- 0