NYC DOB record · X01110476-I1

40 West Mosholu Parkway South

40 West Mosholu Parkway South, Bronx, NY 10468

Alteration filing in Bedford Park, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01110476-I1

40 West Mosholu Parkway South

Bronx, NY 10468

Alteration filing · status dated Sep 8, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
871
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01110476-I1 as a alteration filing at 40 West Mosholu Parkway South, Bronx, NY 10468. Its latest published status category is Approved, dated Sep 8, 2026. The filing records 871 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 8, 2026
Proposed scale
871 proposed dwelling units
Applicant of recordSee the 1088 filings that name Paul Perdek, PROF. ENG. PLLC
FiledSep 30, 2024
Current recordApproved
Proposed scale871 units
Recorded cost$1

What the filing says

A public-record reading of the proposed work.

Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 42-story elevator apartment building built in 1975, with 871 homes, on a 68,259 sq ft lot.

Built
1975
Floors
42
Residential units
871
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R7-1
Lot area
68,259 sq ft
Building area
1,074,490 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 16 open notices on record for this building, out of 185 notices on file; the most recent was issued Nov 6, 2024.

  • Construction

    Issued Nov 6, 2024 — FAILURE TO MAINTAIN FACADE & APPURTENANCES AS OBSERVED MASONRY WALLS DISPLACED/BOWING AT MULT LOC. REMEDY:OWNER TO IMMEDIATELY RETAIN NYS REG DESIGN PROF WITH MASONRY/CAVITY WALLS EXPERIENCE TO INSPECT & EVAL 100% OF ENTIRE EXTERIOR MASONRY WALLS. ROOT CAUSE. INSTALL PUBLIC PROT PERIMETER OF BLDG TO PROT PEDES. REP TO FACADES@BUILDINGS.NYC.GOV

  • Construction

    Issued Nov 6, 2024 — EMERGENCY WORK ORDER DUE TO MASONRY DISPLACEMENT/BOWING ALONG THE FACA EXPOSURES @ MULT LOCATIONS. REMEDY: OWNER TO RETAIN NYS REG. DESIGN PR TO IMMEDIATELY INSPECT ALL DEFECTIVE MASONRY & PROVIDE PLOT PLAN WITH DIMENSION NOTING. REMOVE/SECURE ALL FACADE EXTERIOR WALLS. RDP TO PROV DAILY REPTO FACADES@BUILDINGS.NYC.GOV

  • Construction

    Issued Oct 30, 2024 — PARTIAL VACATE ORDER.AS NOTED IN FISP3 UNSAFE NOTIFICATION #UNSAFE-908 090-9C-001, OBSERVED CRACKED/SPALLED CONCRETE BALCONIES SLABS AT MULTI LOCATIONS (LINES B/C/3/G/H/J/K). THESE CONDITIONS HAVE MADE THOSE BALCONIES UNABLE TO BE OCCUPIED. REMEDY: PARTIAL VACATE ORDER TO ALL FACADES BALCNIES AT LINES (B/C/E/G/H/J/K.)

  • 13 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01110476-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01110476-I1
BIN
2092445
BBL
2032510490
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
871
Proposed dwelling units
871