What the filing says
A public-record reading of the proposed work.
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 9-story care home built in 1931, on a 80,000 sq ft lot.
- Built
- 1931
- Floors
- 9
- Residential units
- 0
- Building type
- Care home
- Land use
- Public facilities and institutions
- Zoning district
- C6-2
- Lot area
- 80,000 sq ft
- Building area
- 480,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 55 open notices on record for this building, out of 143 notices on file; the most recent was issued May 8, 2025.
- Construction
Issued May 8, 2025 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER NOTE MULTIPLE BROKEN CRACKED WINDOWS, DAMAGED BALCONIES OBSERVED DAMAGE CORNICE AND DAMAGED STONE AND WATER TABLE MULTIPLE LOCATIONS. REMEDY: REPAIR AND/OR REPLACE
- Hazardous condition (facade)
Issued Feb 16, 2024 — CYCLE 9C UNSAFE REPORT FILED
- Construction
Issued Aug 9, 2023 — EMERGENCY WORK.BSMNT FL FRAMNG&SLABS&CELLAR LVL COLUMNS IN A STATE OF DISREPAIR.UNDERSIDE OF SLABS HAVE SPALLS W/SEVERELYDTERIORATD MESH EXPOSD IN MULT LOCATIONS.CRCKD&SPALLD CONC ENCASEMENT.IMMED INSTALL TEMP SHORNG&BRACNG OR STRCTRL COLUMN REINFORCMNT@DRECTION OF NYS PE SKETCHES&INSPECTD BY REG SPEC
52 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 15, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01015376-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01015376-I1
- BIN
- 1087298
- BBL
- 1009620097
- Postal code
- 10016 · 575 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0