What the filing says
A public-record reading of the proposed work.
Remove and fill in windows at the south elevation, remove AC openings, and create new openings at the south wall for new windows.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 17-story elevator apartment building built in 1931, with 151 homes, on a 13,425 sq ft lot.
- Built
- 1931
- Last altered
- 1987
- Floors
- 17
- Residential units
- 151
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10
- Lot area
- 13,425 sq ft
- Building area
- 179,213 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 6, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 62 notices on file; the most recent was issued Oct 31, 2025.
- Construction
Issued Oct 31, 2025 — FAILURE TO MAINTAIN.OBSRVD@EXP3 1STFL FACADE MASONRY WALL BLOWN OUT DUE TO IMPROPER CNCRTE PLCMNT@NEIGHBORNG CONSTRUCTION SITE 405 E51 ST BRCK MASONRY FACADE WALL IS PRTLLY CLLPSD,BULGD,CRCKD&DLMNT.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT.FILE FOR PRMTS BY 12/1/25.SGN OFF RPAIRS
- Construction
Issued Oct 31, 2025 — EMERGENCY WORK ORDER.OBSRVD@EXP 3 1STFL,FACADE MASONRY WALL BLOWN OUT DUE TO IMPROPER CNCRTE PLCMNT@NEIGHBORNG CONSTRUCTN SITE 405E 1ST ST BRCK MASNRY FACADE WALL IS PRTLLY CLLPSD,BULGD,CRCKD,DELAMNTD.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO IMMED TEMP STABILIZE THE CMPRMSD FACADE WALL.NYSPE TO SBMT MEANS&METHDS FOR FEU
- No report and / or late filing (facade)
Issued Feb 22, 2024 — FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 3, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01360021-S1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01360021-S1
- BBL
- 1013630043
- Postal code
- 10022 · 871 filings
- Review type
- Professional Certification
- Existing stories
- 16
- Proposed stories
- 16
- Existing dwelling units
- 150
- Proposed dwelling units
- 150