What the filing says
A public-record reading of the proposed work.
Proposed interior renovation to an existing 3 story - 4 res. unit - mix use building
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1931, with 4 homes, on a 1,755 sq ft lot.
- Built
- 1931
- Floors
- 3
- Residential units
- 4
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 1,755 sq ft
- Building area
- 3,822 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 5 notices on file; the most recent was issued May 20, 2026.
- Construction
Issued May 20, 2026 — FTM BLDG IN A SAFE CONDITION-BLDG SUFFERED FIRE DAMAGE ON/AROUNF MAY 19, 2026.FIRE DAMAGES WERE OBSVD ON 1FL STOREFRONT & EXP1WLL OPENINGS OF UPPER FLOORS WINDOWS & STOREFRONT WERE BOARDED UP.OWNER TO RETAIN NYSPE TO EVAL ENTIRE STRUCT & OBTAIN PERMIT FOR REPAIRS.WORK TO START BY 07/06/26
- Construction
Issued May 19, 2026 — STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. PREMISES SUFFERED SIGNIFICANT FIRE AND WATER DAMAGE INCLUDING CHARRED MEMBERS, BROKEN/MISSING WINDOWS AND OPEN SKYLIGHT.
- Low pressure boiler
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01445667-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01445667-I1
- BIN
- 3123257
- BBL
- 3052970039
- Postal code
- 11218 · 1557 filings
- Review type
- Standard Plan Examination
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 4
- Proposed dwelling units
- 4








