NYC DOB record · B00649936-I1

408 63 Street

408 63 Street, Brooklyn, NY 11220

Alteration filing in Sunset Park (Central), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00649936-I1

408 63 Street

Brooklyn, NY 11220

Alteration filing · status dated Jul 27, 2026

Current record
Approved
Proposed scale
9 stories
Dwelling units
76
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00649936-I1 as a alteration filing at 408 63 Street, Brooklyn, NY 11220. Its latest published status category is Approved, dated Jul 27, 2026. The filing records 9 proposed stories and 76 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Jul 27, 2026
Proposed scale
9 proposed stories and 76 proposed dwelling units
The building, not the filingEvery filing at BIN 3429067, with the parcel and violation recordApplicant of recordSee the 4 filings that name Caples Jefferson Architects, PC
FiledDec 30, 2021
Current recordApproved
Proposed scale9 stories
Recorded cost$1.6M

What the filing says

A public-record reading of the proposed work.

Buildout of new PreK space, interior partitions, ceiling and work per plans. No change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 9-story condominium built in 2021, with 84 homes, on a 14,000 sq ft lot.

Built
2021
Floors
9
Residential units
84
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R7A
Lot area
14,000 sq ft
Building area
78,492 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building. 15 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00649936-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00649936-I1
BBL
3058097501
Review type
Standard Plan Examination
Existing stories
9
Proposed stories
9
Existing dwelling units
76
Proposed dwelling units
76
General construction