What the filing says
A public-record reading of the proposed work.
#8209 - Installation of 3 new sprinkler heads in House of Hoops space.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story store building built in 1937, on a 10,827 sq ft lot.
- Built
- 1937
- Last altered
- 2013
- Floors
- 3
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- C5-4
- Lot area
- 10,827 sq ft
- Building area
- 43,360 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 44 open notices on record for this building, out of 123 notices on file; the most recent was issued Jun 1, 2022.
- Failure to
Issued Jun 1, 2022 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
- Non-residential elevator periodic
Issued Dec 17, 2021 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
- Non-residential elevator periodic
Issued Dec 17, 2021 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
41 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00204391-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00204391-I1
- BBL
- 3001560012
- Postal code
- 11201 · 3965 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0