NYC DOB record · Q01217828-S1

41-12 249 Street

41-12 249 Street, Queens, NY 11363

New building filing in Douglaston-Little Neck, Queens. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Nov 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01217828-S1

41-12 249 Street

Queens, NY 11363

New building · status dated Nov 10, 2026

Current record
Approved
Proposed scale
2 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01217828-S1 as a new building at 41-12 249 Street, Queens, NY 11363. Its latest published status category is Approved, dated Nov 10, 2026. The filing records 2 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Nov 10, 2026
Proposed scale
2 proposed stories and 1 proposed dwelling unit
Applicant of recordSee the 1 filings that name 3w Engineering LLC
FiledOct 14, 2026
Current recordApproved
Proposed scale2 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

File soe, foundation and structure work as per plan filed herewith. no change in use, occupancy or egress.

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01217828-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01217828-S1
BIN
4624785
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
2
Existing dwelling units
Empty in the source
Proposed dwelling units
1
General constructionStructural workFoundation workEarthwork