What the filing says
A public-record reading of the proposed work.
The project consist of minor interiorrenovation of 4,696 sf of 33 office spaces andat 2nd floor with no structural alteration.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 10-story condominium built in 1920, on a 21,073 sq ft lot.
- Built
- 1920
- Last altered
- 2015
- Floors
- 10
- Residential units
- 0
- Building type
- Condominium
- Land use
- Commercial and office
- Zoning district
- C6-4
- Lot area
- 21,073 sq ft
- Building area
- 204,555 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 78 notices on file; the most recent was issued Jun 20, 2022.
- Hazardous condition (facade)
Issued Jun 20, 2022 — CYCLE 9A UNSAFE REPORT FILED
- Construction
Issued Jun 2, 2022 — EMERGENCY WOR ORDER DUE TO THE DEFECTIVE ON FACADE. IMMED INSTALL SAFETY MEASURES AT EXP1(WEST ELEV) THERE IS UNSAFE CONDITIONS. SHOULD BE INSTALLING IN ONE WEEK. REMEDY: IMMED PROVIDE SAFETY MEASURES TO SECURE THE PUBLIC AT EXP1(WEST ELEV)
- Construction
Issued Apr 10, 2019 — .AT TIME OF INSPECTION OBSERVED TO HAVE BEEN SUSTAINED TO SIDEWALK SHED AT CORNER OF FLATBUSH AVENUE EXTENSSION AND CONCORD STREET DUE TO VEHICLE IMPACT AT 49 FLATBUSH AVENUE EXTENSION
1 further open notice is on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00587872-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00587872-I1
- BBL
- 3021067504
- Postal code
- 11217 · 3383 filings
- Review type
- Professional Certification
- Existing stories
- 10
- Proposed stories
- 10
- Existing dwelling units
- 0
- Proposed dwelling units
- 0